Process Plant and Works Projects: Examples of Projects Undertaken

IMGP0565.JPG
IMGP0556.JPG
Weld Repairs 001.jpg
Weld Repairs 008.jpg
Weld Repairs 026.jpg
Weld Repairs 047.jpg
Weld Repairs 044.jpg
Weld Repairs 039.jpg
Foscor Drying Kiln High Carbon Steel Riding Ring Repair
Weld Repairs 031.jpg
Moz1.jpg
Moz4.jpg
Moz2.jpg
Moz5.jpg
Moz3.jpg
Moz6.jpg
Moz8.jpg
Moz7.jpg
Moz9.jpg
La Farge Cement Works Maputo Mozambique Kiln Repair  - 60 Ton Shell Segment Replacement using Big Bertha - 80 ton Spreader Bar designed and built in house
Xstrata Kiln Upliftment Australia
holcim ct (1).jpg
holcim ct (12).jpg
holcim ct (24).jpg
Holcim Cement Sands Plant Blouberg Cape Town
holcim ct (7).jpg
holcim ct (37).jpg
holcim ct 2 (17).jpg
holcim ct (18).jpg
holcim ct (30).jpg
holcim ct 2 (22).jpg
Image027.jpg
Image026.jpg
Image021.jpg
Chilanga Cement Factory Indola Zambia  47 ton Kiln Section Replacement
Image027.jpg
Image030.jpg
Frame Design1.jpg
Frame Design2.jpg
colleenbawn014.jpg
colleenbawn025.jpg
colleenbawn026.jpg
colleenbawn076.jpg
Collenbawn Zimbabwe La Farge Cement Kiln Repair - first use of 75 ton capacity modular support frame
Design 2.jpg
Design 1.jpg
Namakwa Sands 30 ton Trommel rigging frame single support pin 65mm diameter
Meric + 3 Wishes (8).jpg
Meric + 3 Wishes (9).jpg
Meric + 3 Wishes (2).jpg
Meric + 3 Wishes (4).jpg
Meric + 3 Wishes (10).jpg
Meric + 3 Wishes (6).jpg
Meric + 3 Wishes (11).jpg
Image014A.JPG
Slurry Kiln Drive Pinion Modification and Rebuild
Image002.jpg
Drive Shaft.jpg
Image018.jpg
Image000.jpg
Image036.jpg
Image011.jpg
Photo0033.jpg
Image022.jpg
Photo0031.jpg
Image010.jpg
Wiluna Gold Mine Project - 11 KV Gas Fired Power Station -  1750 kW Cummings Engine re-in-statement  and performance software optimization.
Photo0035.jpg
Image013.jpg
Image012.jpg
13120015.jpg
13120023.jpg
DSCN4763.JPG
DSCN4785.JPG
IMG-20140219-00379.jpg
IMG-20140219-00377.jpg
Mt Isa Sampling project - CV003
Installation: Material sample off main ROM belt supplying composite plant
DSCN4787.JPG
14030013.jpg
14030005.jpg
14030047.jpg
14030014.jpg
14030020.jpg
20140330_121601.jpg
901 Installation (3).jpg
14030043.jpg
20140317_124034.jpg
13040008.jpg
Mt Isa Sampling project - 801
Installation: Material sample off main belt supplying size reduced material to plant
14030001.jpg
DSCN5251.JPG
20140330_114441.jpg
14030015.jpg
14030049.jpg
Chute Mods 901-1.jpg
20140612_123937.jpeg
901 Chute modifications to drop bin level to allow for access for Cross Cutter. Originally bin used to overflow continuously, post mods dropped  bin level by 1250 mm
901 Installation (17).jpg
901 Installation (69).jpg
901 Installation (63).jpg
901 Installation (62).jpg
901 Installation (65).jpg
901 Installation (20).jpg
901 Installation (23).jpg
901 Installation (72).jpg
901 Installation (21).jpg
901 Linear Cam to allow for extending the position of the Cross Cutter into the material stream.
Head Slide 901 (32).JPG
Head Slide 901 (34).JPG
Head Slide 901 (30).JPG
Head Slide 901 (29).JPG
901 Cross Cutter Slide mount to allow for the extension and retraction of the Cross Cutter from its housing into the material stream. 
Head Slide 901 (31).JPG
901 Installation (41).jpg
901 Installation (90).jpg
901 Installation (91).jpg
901 Installation (39).jpg
901 Cross Cutter assembly and testing
901 Installation (10).jpg
901 Installation (84).jpg
901 Installation (46).jpg
901 Installation (30).jpg
901 Installation (56).jpg
901 Installation (31).jpg
901 Installation (75).jpg
901 Installation (73).jpg
901 Installation (55).jpg
Mt Isa 901 Sampler Installation monitoring material being discarded as waste
901 Installation (54).jpg
WP_20151006_10_29_39_Pro__highres.jpg
WP_20151007_15_47_18_Pro__highres.jpg
WP_20151006_14_58_39_Pro__highres.jpg
WP_20151008_09_57_43_Pro__highres.jpg
WP_20151006_14_56_08_Pro__highres.jpg
WP_20151006_14_56_58_Pro__highres.jpg
WP_20151006_14_55_59_Pro__highres.jpg
WP_20151006_14_55_28_Pro__highres.jpg
WP_20151006_14_55_18_Pro__highres.jpg
WP_20151006_14_56_16_Pro__highres.jpg
WP_20151006_14_56_30_Pro__highres.jpg
WP_20151006_16_15_38_Pro__highres.jpg
Roy Hill Iron Ore Mine - Pilbara Western Australia - Part of TAKRAF crew commissioning 3 identical ROM lines feeding the main plant. Specialist on Siebtechnik Grizzly Screens
Place 2.JPG
Place 14.JPG
Place 15.JPG
Commisioning 11.JPG
Commisioning 2.jpg
Commisioning 13.JPG
Commisioning 12.JPG
Commisioning 14.JPG
Commisioning 18.jpg
Commisioning 17.jpg
Commisioning 16.jpg
Commissioning 3 Identical Siebtechnik Grizzly Screens
Re-Formatting Amplitude of Vibration
Changing Vibration Amplitude on  3  Siebtechnik Grizzly Screens